WaterSMART Enhancing Water Resources Projects: Up to $3M for Multi-Benefit Watershed Work
The Bureau of Reclamation's WaterSMART Enhancing Water Resources Projects funding opportunity will allocate up to $60 million from the Infrastructure Investment and Jobs Act. It pays for on-the-ground projects that benefit water management for multiple uses: water conservation and efficiency, water infrastructure improvements, and river and watershed restoration. Applicants can request up to $3 million in federal funds for projects that can be finished within three years of award, and a non-federal cost share of 25 percent is generally required. The NOFO has two application periods. The first closed on September 9, 2026. The second, and last, closes September 8, 2027.
First application period: closed Wednesday, September 9, 2026, 4:00 PM MDT
Funding Opportunity Number: R26AS00017
Assistance Listing Number: 15.507
Program Contact: Katherine Tucker, Program Coordinator, ktucker@usbr.gov, (303) 445-2586. Submission questions: bor-sha-fafoa@usbr.gov
Enhancing Water Resources Quick Facts
- Administering Agency: U.S. Department of the Interior / Bureau of Reclamation
- Authority: Section 9504(a) of the SECURE Water Act (42 U.S.C. 10364); Section 6002 of the Cooperative Watershed Management Act; Section 40907 of the Infrastructure Investment and Jobs Act
- Total Funding: up to $60 million across the NOFO (the NOFO does not split it between the two application periods)
- Expected Awards: 30
- Award Range: $50,000 floor to $3,000,000 ceiling in federal funds; total project cost should not exceed $6 million
- Cost Share: generally 25% non-federal; 50% for watershed groups applying without a Category A partner; not applicable to American Samoa, Guam, the Northern Mariana Islands, or the Virgin Islands
- Federal Assistance Type: competitive merit review; awarded as a grant or cooperative agreement, with substantial federal involvement expected
- Period of Performance: projects must be completable within 3 years of award
- Submission Portal: Grants.gov
What This Program Funds and What the NOFO Prioritizes
Reclamation describes the program as supporting projects that are developed collaboratively, provide benefits to multiple sectors, and improve fish and wildlife habitat. Projects that balance community interests such as agriculture, recreation, fisheries, and power, and that provide significant watershed benefits, are prioritized.
Two priorities shape who should apply this round:
- Design maturity. Projects at an advanced stage of design and engineering, generally 60% final design and above, are prioritized in the merit review. Reclamation says projects at only a conceptual level of design should consider the WaterSMART Planning and Project Design or Cooperative Watershed Management Program opportunities instead.
- Construction. A 10-point criterion (Criterion E) rewards construction of hard infrastructure that delivers durable, long-term improvements in water reliability and resilience.
The NOFO also states that the program advances administration priorities identified in E.O. 14154 (Unleashing American Energy) and Secretarial Order 3418, and aligns with E.O. 14332 (Improving Oversight in Federal Grantmaking). Those priorities are scored under Criterion D, described below.
The NOFO posted on Grants.gov was revised on July 6, 2026. The revised document doesn't mark what changed, and it still lists the announcement type as "Initial." If your team worked from an earlier copy, compare it against the current version on Grants.gov before you start writing.
Who Can Apply
The NOFO sets out three applicant categories.
Category A
- States, Tribes, irrigation districts, and water districts
- State, regional, or local authorities whose members include one or more organizations with water or power delivery authority
- Other organizations with water or power delivery authority
Category A applicants must be located in the Western United States or Territories as identified in the Reclamation Act of 1902: Alaska, Arizona, California, Colorado, Hawaii, Idaho, Kansas, Montana, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, Oregon, South Dakota, Texas, Utah, Washington, Wyoming, American Samoa, Guam, the Northern Mariana Islands, the U.S. Virgin Islands, and Puerto Rico.
Category B
Nonprofit conservation organizations acting in partnership with, and with the agreement of, a Category A entity. Category B applicants may be located anywhere in the United States or in the territories listed above. Include a letter of support or other documentation showing the partnership and the Category A entity's agreement.
Category C
Watershed groups as defined in Section 6001(6) of the Cooperative Watershed Management Act, located in the United States or the listed territories. To qualify, the group must:
- Be a grassroots, non-regulatory entity that addresses water availability and quality issues within the watershed
- Be capable of promoting the sustainable use of water resources in the watershed
- Make decisions by consensus
- Represent a diverse group of stakeholders from different water use sectors, such as hydroelectric producers, irrigated agriculture, municipal water supplies, recreation, the environment, private property owners, governments, Tribes, and disadvantaged communities
Watershed group applications are ranked separately from all others. A watershed group can apply for 50 percent federal funding on its own, but needs a Category A partner, documented by a letter, to be eligible for 75 percent federal funding.
Not eligible: federal government entities, individuals, and institutions of higher education.
State and local governments may also need to submit their application to their State Single Point of Contact under E.O. 12372 (Intergovernmental Review).
Eligible Project Activities
Projects may include one or more of these activities, as the NOFO lists them:
- Water Supply Reliability: canal lining or piping, irrigation flow measurement, and SCADA automation. These actions must be coupled with a way to make the conserved water available for beneficial instream use, such as an instream water right, a seasonal agreement to modify use, or an MOU among water right holders and stakeholders. Projects without instream benefit as a primary purpose should look at WaterSMART Water and Energy Efficiency Grants or Drought Resiliency Projects.
- Strategic Water Management: point-of-diversion changes to increase instream supplies in critical reaches, treating return flows to improve water quality, water storage to improve streamflow, and improving the timing or volume of flows at particular locations.
- Restoration: aquatic, riparian, or floodplain habitat restoration; reconnecting floodplains and wetlands to the river channel; beaver dam analogs, post-assisted log structures, and constructed wetlands to treat irrigation water or stormwater; and water quality or temperature improvements.
- Monitoring Plans: developing a monitoring program, pre-construction baseline monitoring, monitoring equipment, and up to twelve months of post-construction monitoring. These costs can't exceed 25 percent of total project costs.
- Project-Specific Stakeholder Engagement and Outreach: outreach on final planning and construction with municipal, agricultural, recreational, environmental, landowner, Tribal, and water management interests.
- Invasive Species Treatment: removing invasive vegetation (such as tamarisk and Russian olive) or non-native fish, and barrier fencing or buffer vegetation. Removal must be directly linked to watershed health and is limited to once per geographic footprint. Vegetation removal must include native revegetation or an explanation of why it isn't needed; fish removal must include measures to prevent reintroduction.
- Fisheries Management: fish passage installations or modifications, fish ramps or ladders, non-native fish removal or exclusion infrastructure, and fish habitat improvements such as gravel augmentation.
- Forest Management: fuels management to reduce severe wildfire risk, and post-wildfire restoration such as soil stabilization, erosion control, sediment removal, and reforestation. Projects need a clear nexus to water resources and are limited to one treatment per geographic footprint. Post-fire sediment removal must be paired with revegetation, erosion control, and habitat restoration in the affected river or reservoir.
All project components should be in the same watershed. Combine closely related components in one application and submit loosely related ones separately; applications that don't follow this may be removed from consideration.
What the Program Won't Fund
- Normal operations, maintenance, and replacement (OM&R): repairs or replacements that don't increase efficiency or effectiveness over the life of the improvement.
- On-farm irrigation efficiency improvements. The NOFO points these to NRCS. Some components may still occur on private or agricultural land if they're part of a project with broader watershed benefits.
- New conveyance to distribute additional or new water supplies for municipal or agricultural use.
- Water and land purchases, leases, and easements (other than construction easements). Drought emergency water purchases go to Reclamation's Drought Response Program.
- Pilot projects that test feasibility or unproven materials or technology.
- Building construction, such as offices or public awareness centers.
- Invasive mussel and other non-fish taxa removal or prevention, which Reclamation funds through a separate Integrated Pest Management and Invasive Species Program.
- CERCLA-regulated activities and most mine remediation. Contact the Program Coordinator if your project involves work around a mine site.
- General training, education, and outreach, including citizen science training and general staff training.
- Projects funded under another federal financial assistance agreement. Other federal funding can't be part of the project scope.
- Proposal costs, including developing data to support the application.
- Post-construction monitoring beyond twelve months, which the NOFO treats as normal O&M at the applicant's expense.
Award Amounts, Limits, and Cost Share
- Categories A and B: up to $3 million in federal funds for projects completed within 3 years of award.
- Category C (watershed groups): up to $3 million over 3 years, with no more than $1 million available per year. Each year Reclamation decides from the semi-annual performance reports whether progress justifies more funding.
- Multiple applications are allowed if the scopes aren't duplicative. A Category A entity is limited to $3 million in federal funding per application period. A Category B applicant can be considered for up to $9 million per application period if each project has a different Category A partner.
- Total project cost (federal plus non-federal) should not exceed $6 million.
Cost share. A 25 percent non-federal share is generally required at the time of award. The NOFO's example: a $4 million project needs at least $1 million in non-federal funds, with a $3 million federal share. All cost share must come from non-federal sources and meet 2 CFR 200.306. Watershed groups without a Category A partner carry a 50 percent share. The cost-share requirement does not apply to American Samoa, Guam, the Northern Mariana Islands, or the Virgin Islands; Puerto Rico is not on that list.
Exceeding the minimum share earns points under Criterion F. Reclamation will verify reported cost share for selected projects, and ineligible cost share may reduce the award amount.
How Applications Are Scored
Applications are scored on six criteria, for a total of 105 points:
- Criterion A. Project Benefits (40 points).
- A.1 Benefits to Multiple Users, Stakeholders, and Interests (15): which sectors benefit and how much, including critical infrastructure, fisheries, recreation access, public safety, lower maintenance costs, jobs, and reduced water conflict.
- A.2 Water Supply, Quality, and System Benefits (10): water conserved in acre-feet per year, how much will be made available for instream use through a formal mechanism, and water quality and hydrologic function improvements.
- A.3 Fish and Wildlife Benefits (10): the species that will benefit and their status, habitat improvements, and watershed resilience.
- A.4 Project Performance and Monitoring (5): performance measures and, for projects that benefit streamflow or aquatic habitat, a five-year post-implementation monitoring plan.
- Criterion B. Project Planning and Support (15 points). B.1 Prior Planning (5): whether the project is identified in a collaboratively developed planning document; discuss only the most relevant plan and attach the referenced sections. B.2 Project Support (10): current support from a diverse set of stakeholders, shown by letters, third-party cost share, or in-kind contributions. Opposition won't necessarily cost points, but you should explain how you'll address it.
- Criterion C. Readiness to Proceed (15 points). C.1 Design and Engineering (5): design work completed at application, with 60% final design or more scoring higher. C.2 Environmental and Cultural Compliance (5): required permits, the level of compliance your local Reclamation office expects (EIS, EA, etc.), and cost and timeline. C.3 Project Implementation (5): schedule with milestones, land and water access, and easements.
- Criterion D. Presidential and Department of the Interior Priorities (20 points). The extent to which the project advances E.O. 14154 and E.O. 14332; includes primary elements that develop, demonstrate, or implement artificial intelligence technologies (citing OMB M-25-21 and S.O. 3444); aligns with Secretarial Orders 3417, 3418, and 3419; or aligns with the DOI FY 2026–2030 Strategic Plan, with priority to the Colorado River Basin and other basins in long-term drought. Address only the priorities that apply. All carry equal weight, and addressing more of them doesn't guarantee more points.
- Criterion E. Construction Priority (10 points). Construction projects that can be completed within the allowable duration, with priority for hard infrastructure. Identify the hard infrastructure components.
- Criterion F. Cost Share Priority (5 points). Non-federal cost share that exceeds the minimum by at least 5 percent. Show the calculation: non-federal funding divided by total project cost.
The NOFO's sub-criterion text doesn't always match its own headings. Criterion A's opening says "up to 35 points" although it totals 40. B.1 is headed 5 points but its text says "up to 15." C.1 is headed 5 points but its text says "up to 10." The scoring summary table lists A=40, B=15, C=15, D=20, E=10, F=5. If the point values matter to how you allocate pages, ask the Program Coordinator.
The Review Process
An eligibility and initial review comes first. It checks eligibility, completeness, responsiveness to the program, and compliance with applicable executive and secretarial orders. Applications are removed if they lack completed SF-424 and SF-424A forms, an active SAM.gov registration with a valid UEI, a project narrative, or a budget narrative.
After the merit review, Reclamation runs a "red-flag" review of top-ranking applications (compliance, permitting, legal, financial, or performance concerns) and then a managerial review. Under E.O. 14332 that review includes senior appointees. Geographic dispersion, project types, applicant types, previous award history, and success implementing Gold Standard Science (E.O. 14303) may also be considered. A pre-award risk review under 2 CFR 200.206 follows.
What the Application Must Contain
- SF-424 (all applicants) and SF-424A, filled out with both federal and non-federal costs. In Section D, put all costs in the first quarter of the first year and enter "0" in Section E.
- SF-LLL, if you request more than $100,000 and use or plan to use non-federal funds for lobbying related to the project.
- Project Abstract Summary (award purpose, activities, deliverables, beneficiaries, subrecipient activities). Leaving it out won't remove the application.
- Project Narrative, including the merit criteria responses, limited to 30 numbered pages. Only the first 30 are evaluated. The full application, including attachments, should not exceed 100 pages. Use at least 12-point font, 8½ by 11 inch pages, and 1-inch margins. The narrative covers:
- Title page and table of contents
- Executive summary: date, applicant, city, county, and state; your applicant category (and Category A partner, if B or C); a one-paragraph project summary; length of time and estimated completion date; and whether the project is on a federal facility, in a basin adversely affected by a Reclamation project, or meeting existing environmental mitigation obligations
- Project location with a map and latitude/longitude
- Technical project description: scope, materials and equipment, site preparation, and construction impact areas, plus any features listed or eligible for the National Register of Historic Places. Keep the schedule and benefits out of this section.
- Merit criteria responses, in the order presented
- Letters of support, attached at the end. They don't count toward page limits, and letters received after the deadline won't be evaluated.
- Budget narrative identifying total costs, non-federal cost share, third-party contributions, and any pre-award costs, plus how you'll charge indirect costs (the de minimis rate of up to 15% of modified total direct costs, or a negotiated rate agreement). Reclamation's budget guidance says construction-related costs belong in the Construction category and must be excluded from the indirect cost base.
- Letters of commitment from third-party cost-share sources, stating the amount, when it's available, and any contingencies.
- Overlap or duplication statement covering activities, costs, and key personnel time across other federal proposals or awards, even if no overlap exists.
- Conflict of interest disclosure, if any actual or potential conflict exists.
- Landowner consent letter, if any part of the project is on land or facilities owned by someone other than you or your Category A partner.
Pre-award costs incurred after the NOFO was posted are allowed with Grant Officer approval, at your own risk. Include environmental and cultural compliance costs in the budget; Reclamation will review and adjust them if the project is selected. Reclamation may also provide technical assistance after award on a fee-for-service basis, which should be discussed and budgeted before you apply.
Submission
Applications go through Grants.gov, and only a person with the Authorized Organization Representative (AOR) role can submit. The NOFO says SAM.gov registration can take several months and asks you to allow 30 days for Grants.gov registration. Reclamation's FAQ says registration may take six weeks or more and recommends starting at least six weeks before the deadline. Don't encrypt, zip, or password-protect files.
The NOFO lists mail and courier addresses for hard-copy applications. Reclamation's general FAQ says a paper application is accepted only with Grants Officer approval under exigent circumstances, such as a federally declared disaster area, requested by email at least 14 days before the deadline, and that mailed applications without prior approval will be rejected. On late submissions, the NOFO allows an exception only for delays caused by Reclamation or for documented Grants.gov technical issues with a helpdesk ticket number. Problems with your own Grants.gov profile, uploads, or SAM.gov registration don't count.
Timeline
- First application period: closed September 9, 2026. Selections are anticipated in March 2027, with projects starting around August 2027 and ending around September 2030.
- Second application period: closes September 8, 2027, 4:00 PM MDT. Selections are anticipated in March 2028, with projects starting around August 2028 and ending around September 2031.
The NOFO is inconsistent on some dates. The Award Notices section says Reclamation expects to contact applicants in "March 2026 and March 2027," while the Program Description gives March 2027 and March 2028 for selections. The same section lists anticipated start and end dates of 08/01/2027 and 08/01/2030 alongside the September 2030 and 2031 end dates above.
Construction start limitation. The Program Description says the estimated construction start date shouldn't be earlier than 12 months after selections are announced, and that applications that don't conform may be removed. The executive summary instructions say 12 months after the application period's submission deadline instead. For the second period, the stricter reading puts construction no earlier than March 2029. Plan your schedule around that date unless Reclamation tells you otherwise.
After Award
- Award notices come through GrantSolutions or email. Reclamation holds a webinar for successful applicants within 30 days of selection on next steps.
- Official resolution. Before award, your governing body must adopt a resolution identifying the official with authority to sign, confirming it reviewed and supports the application, and committing to work with Reclamation on deadlines.
- ASAP enrollment. All payments run through Treasury's ASAP system, and you must enroll specifically with Reclamation even if you're already enrolled with another agency.
- Environmental compliance first. Every project needs NEPA, ESA, and NHPA compliance before any ground-disturbing activity. That includes biological or water quality surveys, grading, clearing, and excavation. Work starts only after the Grant Officer issues a Notice to Proceed; proceeding early risks forfeiting funding.
- Construction requirements. Infrastructure projects must use American iron, steel, manufactured products, and construction materials (2 CFR 184). Davis-Bacon prevailing wages apply to construction work funded under the Bipartisan Infrastructure Law.
- Agricultural water savings. Under P.L. 111-11, Section 9504(a)(3)(B), irrigation conservation awards require you to agree not to use the savings to increase irrigated acreage or otherwise increase consumptive use.
- Operations and maintenance of funded improvements is 100 percent non-federal.
- Reporting. Federal financial reports (SF-425) and program performance reports, with frequency set in your Notice of Award. Performance reports compare accomplishments to milestones, explain missed milestones, and state whether the project is on schedule and within budget. Category C awards are reviewed annually using semi-annual performance reports. Final reports are public and may be posted on Reclamation's website.
- Other conditions include geospatial data standards and metadata, FFATA reporting of subawards of $30,000 or more, and additional reviews for improvements to federal facilities.
Practical Guidance
- Treat September 8, 2027 as your only shot. It's the last application period under this NOFO, and the NOFO doesn't say how much of the $60 million will remain after first-period selections.
- Lock in the instream mechanism. If your project is canal lining, piping, metering, or SCADA, you need a formal or documented way to put the conserved water toward instream use. Without one, Reclamation steers you to other WaterSMART programs.
- Get the design to 60%. Design maturity is scored under Criterion C and named as a program priority. A conceptual project belongs in Planning and Project Design or the Cooperative Watershed Management Program.
- Build the monitoring plan early. Projects meant to improve streamflow or aquatic habitat need a five-year post-implementation monitoring plan. The Program Description ties this to requests of $500,000 or more, while Sub-criterion A.4 states it without a dollar threshold, so plan on including one. Only up to twelve months of post-construction monitoring is fundable, and all monitoring costs together are capped at 25% of total project cost.
- Call your local Reclamation office about compliance now. C.2 asks what level of NEPA review they expect. Budget those costs, and don't schedule baseline biological or water quality surveys before the Notice to Proceed.
- Collect letters before the deadline. That means support letters, third-party commitment letters, landowner consent, and, for Category B and C applicants, the Category A partner letter. Late letters aren't evaluated.
- Check SAM.gov, Grants.gov, and your board calendar. Confirm your registration and AOR role well ahead of the deadline, and plan when your governing body can adopt the resolution required before award.
Contact Information
- Eligibility and application content: Katherine Tucker, Program Coordinator, ktucker@usbr.gov, (303) 445-2586
- Application submission: funding opportunity team, bor-sha-fafoa@usbr.gov. Put R26AS00017 in the subject line of any email.
- Grants.gov support: 1-800-518-4726 or support@grants.gov
- SAM.gov and UEI help: Federal Service Desk, fsd.gov or 1-866-606-8220
Reclamation also offers 30-minute calls with program staff through its Bookings page, and lists previously funded projects and applications on the WaterSMART Enhancing Water Resources Projects page.
How Avila Can Help
Enhancing Water Resources asks a lot of a district or utility: a 30-page narrative scored on 105 points, a budget that holds up to cost-share verification, letters from partners and landowners, and reporting for three years after award. Avila helps water districts and local governments find programs like this one, draft the narrative and budget, and track spending, cost share, and reporting once the award is made. Book a demo to see how it works.
For related Reclamation funding, see our WaterSMART Drought Response guide, the WaterSMART Large-Scale Water Recycling guide, and the WaterSMART Applied Science guide. For registration help, see SAM.gov registration.