FY 2025-2026 Congestion Relief Program: $100M for Big-Metro Congestion Projects

The Federal Highway Administration (FHWA) has reopened the Congestion Relief Competitive Grant Program with up to $100 million in FY 2025 and FY 2026 funding. It pays for congestion management systems, pricing, mobility services, and travel-incentive programs in urbanized areas with more than one million people. Every award is at least $10 million, FHWA expects to make fewer than 10, and applications are due in four weeks.

Application deadline: December 17, 2026, 11:59:59 PM Eastern, through Grants.gov
Funding Opportunity Number: FHWA-CRPP-27-001
Assistance Listing Number: 20.269
Program Contact: FHWA Office of Competitive Grants and Workforce Programs, congestion.relief@dot.gov

FY 2025-2026 Congestion Relief Quick Facts

  • Administering Agency: U.S. DOT / Federal Highway Administration
  • Authorizing Statute: 23 U.S.C. § 129(d), created by the Infrastructure Investment and Jobs Act
  • Total Funding: up to $100 million in FY 2025 and FY 2026 funds, plus any remaining FY 2022-2024 funds DOT chooses to award
  • Minimum Award: $10 million by statute, which means a total project cost of at least $12.5 million
  • Maximum Award: none set; FHWA anticipates fewer than 10 awards
  • Cost Share: at least 20% non-federal; applications below 20% are ineligible
  • Federal Assistance Type: competitive, cost-reimbursable grant
  • Period of Performance: expected 1 to 4 years from grant agreement execution
  • Obligation Deadlines: September 30, 2028 (FY 2025 funds) and September 30, 2029 (FY 2026 funds)
  • Submission Portal: Grants.gov

What Changed in This NOFO

This notice rescinds and replaces the prior Congestion Relief NOFO. According to FHWA, the changes:

  • Remove references to rescinded Executive Orders and align the program with current Executive Orders and administration priorities, including DOT's Freedom to Drive initiative
  • Rewrite the evaluation criteria. The new merit criteria center on measurable congestion, cost savings for families and businesses, and getting more out of existing highway capacity
  • Add a required application form: the Congestion Relief Application Template, attached to Item 15 of the SF-424

If you started an application under the earlier notice, check it against the new criteria and template before you submit.

Who Can Apply

  • States, for a project in an urbanized area with more than 1,000,000 people
  • Metropolitan planning organizations, cities, or municipalities, for a project in an urbanized area with more than 1,000,000 people

Counties, transit agencies, and special districts are not named as eligible applicants. They can join as partners on a joint application, but the lead applicant must be an eligible entity. Joint applications must describe each partner's role and be signed by each applicant.

There is no limit on the number of applications. If you submit more than one, rank them on the cover page.

Eligible Projects

Funds can pay for planning, design, implementation, and construction of a single project or an integrated set of projects, including:

  • Integrated congestion management systems. By statute, these must include at least traffic incident management, work zone management, traffic signal timing, managed lanes, real-time traveler information, and active traffic management across the region.
  • Systems to implement or enforce high-occupancy toll lanes, cordon pricing, parking pricing, or congestion pricing
  • Mobility services, including account-based payment systems, commuter buses and vans, express operations, paratransit, and on-demand microtransit
  • Incentive programs that encourage carpooling, non-highway travel during peak periods, or off-peak travel

Tolling Rules

  • If you are requesting construction funds only and the project relies on tolls, you must already have the federal, state, and local authority to toll before receiving funds.
  • Tolling on the Interstate System requires a request for authority under 23 U.S.C. § 129(d)(6)(A), with the information listed in the Application Template. DOT can approve Interstate tolling under this program in no more than 10 urbanized areas.
  • The program does not grant tolling authority for roads off the Interstate. Those projects need authority under the General Tolling Program (23 U.S.C. § 129(a)) or the HOV facilities statute (23 U.S.C. § 166).

Cost Share and Funding Rules

  • At least 20% must be non-federal: state or local revenue or private funds. Applications short of 20% are ineligible.
  • Costs already incurred do not count toward the match. Neither do funds already spent or encumbered.
  • No pre-award costs. Unless DOT authorizes them in writing after selections are announced, costs incurred before DOT obligates funds cannot be reimbursed or counted as match.
  • The 10% development cap. For construction projects, no more than 10% of the grant can go to development-phase activities (23 U.S.C. § 129(d)(5)(F)(i)). This is part of the readiness review.
  • State formula funds need a letter. If an applicant other than the state DOT plans to use federal-aid formula funds apportioned to the state DOT, the application must include a letter from the state DOT agreeing to administer the project with the applicant as subrecipient.

How Applications Are Rated

DOT rates eligible applications in two stages and then applies priority considerations.

Stage 1: Three Merit Criteria

Each criterion is rated Highly Responsive, Responsive, or Non-Responsive. Every rating depends on quantifiable data.

  1. Reduce highway congestion. Objective A requires data showing that National Highway System facilities in the project area meet one of these thresholds:
    • a Travel Time Index of 1.07 or higher
    • a Planning Time Index of 1.35 or higher
    • the corridor misses its state DOT or MPO targets for travel time reliability (LOTTR), truck travel time reliability (TTTR), or peak hour excessive delay (PHED)
    The other objectives: (B) apply operational strategies and technology such as dynamic signage, adaptive signal phasing, or dynamic pricing; (C) relieve a chokepoint, which may include a freight bottleneck, without reducing travel lanes; and (D) maintain or improve safety performance. Highly Responsive requires A, B, C, and D.
  2. Reduce costs associated with congestion and promote economic competitiveness. (A) Quantified travel efficiencies that save money for families and businesses, plus either (B) addressing a documented bottleneck, including freight bottlenecks named in a national or state freight plan, a congestion management plan, or an ITS architecture plan, or (C) reducing congestion in an area that supports critical minerals, steel, the defense industrial base, or pharmaceutical manufacturing.
  3. Optimize existing highway capacity, including through emerging technology. (D) System-based performance monitoring and evaluation of an emerging but underused technology, plus at least one of: (A) shifting users to off-peak times, (B) coordinating modes during peak periods, or (C) an early U.S. deployment of an emerging transportation technology.

Criterion 1 carries the most weight. A Medium-High overall merit rating requires two Highly Responsive criteria, one of which must be Criterion 1, and no Non-Responsive ratings. A High rating requires all three Highly Responsive. Any Non-Responsive rating makes the overall merit rating Low, and only applications rated Medium or higher go on to the readiness review.

Stage 2: Project Readiness

DOT scores three areas from 1 to 3:

  • Technical: staffing and technical capacity, compliance with federal requirements, a schedule that meets the obligation deadlines, and technical feasibility
  • Financial completeness: reasonable costs with a plan for cost overruns, available funding for the full project, and, for construction, how future operations and maintenance will be paid for and compliance with the 10% development cap
  • Permitting risk: NEPA status, permits, public engagement, and disclosure of any litigation, public controversy, or agency opposition on environmental grounds. Projects eligible for a categorical exclusion under 23 CFR § 771.117(c) should say so.

Any single score of 1 makes readiness Low, and a Low rating on either stage results in Not Recommended. Highly Recommended requires at least a Medium-High merit rating and a High readiness rating.

Priority Considerations

Among applications with similar ratings, DOT first gives statutory priority to urbanized areas with a high degree of recurring congestion. It may then favor projects that:

  • are highly ready or highly rated on merit
  • reduce travel costs for families or improve access to economic opportunity
  • improve intermodal or multimodal freight mobility or supply chain efficiency
  • relieve congestion without limiting vehicle capacity or creating artificial chokepoints
  • improve access to national security and defense facilities or the movement of military cargo or personnel
  • convert existing bike, bus, or pedestrian lanes to general-purpose lanes, if they also meet the program's congestion, safety, Clean Air Act, and 23 U.S.C. § 217(e) requirements

DOT also says it will apply DOT Order 2100.7 on sound economic analysis and Order 2100.9 on nondiscrimination when choosing awards. After review, DOT may offer a smaller award.

What the Application Must Contain

  • SF-424 and SF-LLL for all projects
  • SF-424A for non-construction projects, or SF-424C and SF-424D for construction projects
  • The Congestion Relief Application Template, attached to Item 15 of the SF-424. DOT reviews only the template and the supplemental documents its instructions allow
  • A budget showing the amount and percentage of federal and non-federal funds, in the template or as an attachment
  • A project narrative of no more than 25 pages, single-spaced, 12-point font, 1-inch margins, in PDF (Excel forms and Shapefile or KML/KMZ location files are allowed)
  • Suggested file name: "[Applicant organization#]-2026-Congestion Relief"

DOT says it will not ask for more information to complete an incomplete application.

After Award

  • Selection is not permission to start work. Reimbursable costs begin when the grant agreement is signed.
  • Before signing, recipients must show they have considered physical and cyber security risks.
  • Projects must comply with Buy America and Build America, Buy America requirements.
  • Where appropriate, the project must include an analysis of its financial effects on low-income drivers (23 U.S.C. § 129(d)(7)).
  • Recipients file semi-annual progress reports and semi-annual SF-425 financial reports, report the performance measures in the grant agreement, and allow periodic project inspections.

Practical Guidance

  • Confirm eligibility first. Check that your project is inside a Census urbanized area over one million people. If you're a county or transit agency, arrange for an eligible city, MPO, or state to lead the application.
  • Get your congestion data from your MPO this week. Criterion 1 depends on a TTI of 1.07 or higher, a PTI of 1.35 or higher, or missed PM3 targets for your corridor. Your MPO and state DOT already report these numbers.
  • Size the project to at least $12.5 million. The $10 million minimum award plus a 20% match sets the floor. Document where the match comes from, because funding availability is scored.
  • Request the state DOT letter early if you plan to use state-apportioned formula funds. A late letter can hold up the whole application.
  • Don't propose removing travel lanes. Criterion 1(C) only credits chokepoint relief that keeps existing lanes.
  • Write the readiness section with as much care as the narrative. A single score of 1 on technical, financial, or permitting readiness makes the application Not Recommended.
  • Check your SAM.gov registration now. The NOFO warns that registration can take several weeks.
  • Review past awards on FHWA's FY 2022-2024 awards page for comparable projects.

Contact Information

Unsuccessful applicants can request a debrief within 90 days after selections are announced.

How Avila Can Help

Congestion Relief rewards applicants who can back every claim with data: travel time indices, cost savings, a complete funding plan, and a credible schedule, all in a 25-page narrative due December 17. After award, the program requires semi-annual progress and financial reports through the obligation deadlines. Avila helps cities and MPOs find programs like this one, draft the narrative and budget, and track spending and reporting once the award is made. Book a demo to see how it works.

For related transportation funding, see our BUILD grant guide, the FHWA PROTECT resilience grants guide, and the FY 2026 FTA bus grants guide. For registration help, see SAM.gov registration.